BAS and BMS installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing controls cabling, sensors and panels routes low-voltage work through plant rooms and risers shared with energised power systems.
High-energy check
The controls themselves are low energy, but the work happens beside energised switchgear, mechanical plant and systems under test. Treat the surroundings as the hazard.
This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State which nearby systems are energised or under test, the clearance kept from them, and who confirms panel and riser access is authorised.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.