Electrical and power
Battery rack installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing battery racks involves heavy components, stored electrical energy and chemical exposure in confined plant space.
High-energy check
Rack sections and battery modules are heavy, and installed strings hold stored energy that cannot be switched off. Treat connected strings as high energy.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
-
Chemical
Harmful, reactive, flammable, corrosive or toxic substances.
-
Battery systems
Battery strings cannot be switched off. Stored electrical energy, arc potential and chemical exposure are present at all times, and thermal runaway can propagate once started.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the module mass and handling method, the insulated tool requirement, the string voltage present and who is authorised for connection work.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.