This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing busbar sections involves heavy components at height and later connection to energised systems.
High-energy check
Busbar sections lifted overhead can exceed the 1500 J trigger. Energisation status of connected sections adds electrical exposure.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the section mass and installation height, the lifting method, the energisation status of the run and the exclusion below overhead work.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.