Electrical and power
Cable termination and testing
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Terminating and testing cables works at the boundary between dead construction wiring and systems that can be energised from elsewhere.
High-energy check
Treat every cable as live until proven dead at the point of work. Test voltages and back-feeds from other sections are the main exposure.
This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
-
Mechanical
Moving parts, tools, tension, rotation or stored mechanical force.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State how each cable is proven dead, the test voltages applied, who is authorised to test and how the far end of every cable is controlled.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.