Calculation support, not a guaranteed safety decision.

Terminating and testing cables works at the boundary between dead construction wiring and systems that can be energised from elsewhere.

High-energy check

Treat every cable as live until proven dead at the point of work. Test voltages and back-feeds from other sections are the main exposure.

This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.

Trigger checks

Direct controls to verify

Ticks stay on this screen only. Nothing is saved or sent.

For your SPA or pre-start

State how each cable is proven dead, the test voltages applied, who is authorised to test and how the far end of every cable is controlled.