Lifting and logistics
Chiller delivery and positioning
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Delivering and positioning a chiller involves a very heavy moving load, lifting equipment and tight interfaces with structures and people.
High-energy check
A multi-tonne chiller in motion exceeds the 1500 J trigger at little more than creep speed, and tip-over energy is present throughout. Treat the whole movement as high energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the unit mass, the movement method and speed, the route survey result and the exclusion that keeps people out of the line of travel.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.