Work at height
Cladding installation
Gravity
Motion
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing cladding panels involves large loads at height, mechanical lifting and wind-affected handling.
High-energy check
A panel dropped or caught by wind at height exceeds the 1500 J trigger. Wind speed limits are a direct part of the control set.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the panel mass and height, the lifting method, the wind limit for the day and the exclusion below the work face.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.