Lifting and logistics
Crane lift
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
A crane lift places a suspended load above people, plant and structures along the lift path.
High-energy check
Almost every crane lift exceeds the 1500 J trigger. Treat the load and the lift path as high energy at all times.
Trigger checks
-
Mechanical
Moving parts, tools, tension, rotation or stored mechanical force.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the load mass and lift height, the lift plan reference, the exclusion under the load path and who verifies controls before the lift starts.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.