Mechanical and pressure
Fan start-up
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Starting fans introduces rotating energy and airflow into systems that people may still be working on.
High-energy check
Treat first start as high energy. Rotating parts, coast-down time and unexpected remote starts are the main exposures.
Trigger checks
-
Mechanical
Moving parts, tools, tension, rotation or stored mechanical force.
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State how the fan is isolated before guards are fitted, who authorises the start, how people in the duct route are cleared and the coast-down time.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.