Lifting and logistics
Generator set down
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Setting down a generator involves a heavy suspended load, final positioning by hand signals and people working close to the load.
High-energy check
A generator on the hook exceeds the 1500 J trigger. The set-down phase brings hands and bodies closest to the energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the load mass and lift height, how final positioning is controlled without placing hands under the load, and who verifies the exclusion.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.