Commissioning and testing
Load bank testing
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Load bank testing applies full electrical load, producing high current and intense heat at the load bank.
High-energy check
Treat load bank testing as high energy. Cables, connections and the load bank surface carry electrical and thermal energy for the full test.
This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
-
Thermal
Heat, cold, flame, steam, sparks or thermal stress.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the cable routing and protection, the exclusion around the load bank, the surface temperature exposure and who supervises the test.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.