Mechanical and pressure
Pump set installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing pump sets involves heavy units, mechanical alignment work and later rotating and pressure energy.
High-energy check
Pump sets handled by machine or hoist can exceed the 1500 J trigger. Keep hands clear during alignment and set-down.
Trigger checks
-
Mechanical
Moving parts, tools, tension, rotation or stored mechanical force.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the unit mass, the lifting and alignment method, how hands are kept out of crush points and who verifies the exclusion during set-down.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.