Switchgear commissioning
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Commissioning switchgear moves equipment from a dead construction state to an energised operational state in stages.
High-energy check
Treat every commissioning stage change as high energy. The hazard changes each time energy is introduced to a new section.
This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
-
Thermal
Heat, cold, flame, steam, sparks or thermal stress.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State which sections are energised today, how energised sections are marked and secured, and who authorises each stage change.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.