Commissioning switchgear moves equipment from a dead construction state to an energised operational state in stages.

High-energy check

Treat every commissioning stage change as high energy. The hazard changes each time energy is introduced to a new section.

This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.

Trigger checks

Direct controls to verify

Ticks stay on this screen only. Nothing is saved or sent.

For your SPA or pre-start

State which sections are energised today, how energised sections are marked and secured, and who authorises each stage change.