Calculation support, not a guaranteed safety decision.

Setting up temporary power introduces energised distribution equipment into a changing construction environment.

High-energy check

Treat all temporary power as high energy. This tool does not calculate electrical energy.

This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.

Trigger checks

Direct controls to verify

Ticks stay on this screen only. Nothing is saved or sent.

For your SPA or pre-start

State the isolation points, the protection ratings, who is authorised to work on the system and how damaged leads and boards are reported and removed.