This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Setting up temporary power introduces energised distribution equipment into a changing construction environment.
High-energy check
Treat all temporary power as high energy. This tool does not calculate electrical energy.
This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the isolation points, the protection ratings, who is authorised to work on the system and how damaged leads and boards are reported and removed.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.