Electrical and power
Transformer delivery
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Transformer delivery combines a very heavy moving load with lifting, positioning and later connection to electrical systems.
High-energy check
A transformer in motion exceeds the 1500 J trigger at any practical speed. Treat the movement and set-down as high energy.
Trigger checks
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the unit mass, the movement and lifting method, the route condition and the exclusion that keeps people out of the line of travel.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.