Mechanical and pressure
AHU and mechanical plant installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing air handling units and plant involves very heavy modules, machine lifting into tight plant rooms and power tool work around the unit.
High-energy check
AHU modules and plant sections exceed the 1500 J trigger whenever they are lifted clear of the floor, and skated moves carry serious crush and tip-over exposure at any speed. Keep every person out from under and beside the moving unit.
Trigger checks
-
Sound
Harmful noise or impulse sound.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the module mass, the lifting or skating method, the route and floor loading check and the exclusion around the movement.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.