Work at height
Containment bracketry installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing unistrut framing and bracketry involves overhead drilling into concrete, anchor loads and power tool use above other trades.
High-energy check
Unistrut lengths and drills dropped from height can exceed the 1500 J trigger. Overhead concrete drilling produces noise and dust this tool does not calculate.
Trigger checks
-
Mechanical
Moving parts, tools, tension, rotation or stored mechanical force.
-
Sound
Harmful noise or impulse sound.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the fixing method and anchor loads, how lengths and tools are secured at height, and the exclusion or protection below the work.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.