Integrated testing runs multiple building systems together, so equipment can start, move or change state without local warning.

High-energy check

Treat the whole test boundary as high energy. Automatic starts and state changes are the defining exposure.

This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.

Trigger checks

Direct controls to verify

Ticks stay on this screen only. Nothing is saved or sent.

For your SPA or pre-start

State the systems in the test, the areas where automatic operation is possible, how those areas are marked and how work in them is controlled.