Mechanical and pressure
Pipe spool installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing pipe spools involves heavy sections, work at height and future pressure energy in the completed system.
High-energy check
Spools lifted into position can exceed the 1500 J trigger. Later testing introduces pressure energy this tool does not calculate.
Trigger checks
-
Pressure
Compressed gas, liquid, hydraulic, pneumatic or vacuum energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the spool mass and lift height, the support and fixing method, and the exclusion below while sections are being placed.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.