Mechanical and pressure
Pump start-up
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Starting pumps introduces rotating and pressure energy into pipework that may still be open or occupied by other trades.
High-energy check
Treat first start as high energy. Pressurising open or incomplete pipework is the main release scenario.
This task's main energy sources are not calculated by this tool. Use the trigger checks below and competent-person verification.
Trigger checks
-
Mechanical
Moving parts, tools, tension, rotation or stored mechanical force.
-
Electrical
Current, voltage, energisation, arc flash or stored electrical energy.
-
Pressure
Compressed gas, liquid, hydraulic, pneumatic or vacuum energy.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the system boundary being pressurised, how open ends are verified closed, who authorises the start and how other trades are informed.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.