Civil, structures and fit-out
Structural steel erection
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Erecting structural steel combines crane lifts, work at height, heavy sections being landed and bolted, and grinding and welding.
High-energy check
Every steel section on the hook exceeds the 1500 J trigger. Partially bolted connections and unsecured sections are the main release points.
Trigger checks
-
Mechanical
Moving parts, tools, tension, rotation or stored mechanical force.
-
Sound
Harmful noise or impulse sound.
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the section masses and lift plan, the minimum bolting before release from the crane, the fall protection for erectors and the exclusion below.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.