Excavation work combines ground collapse exposure, plant movement and buried services.

High-energy check

Treat excavations deeper than 1.2 metres as high energy for collapse. A cubic metre of soil weighs over a tonne.

Trigger checks

Direct controls to verify

Ticks stay on this screen only. Nothing is saved or sent.

For your SPA or pre-start

State the depth and support method, the access and egress, the spoil and plant standoff, the service drawings checked and the permit status.