Process piping installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing chilled water and condensate pipework involves heavy pipe at height, threading and grinding, and future pressure in the completed system.
High-energy check
Pipe lengths lifted overhead can exceed the 1500 J trigger. Later filling and testing add pressure energy this tool does not calculate.
Trigger checks
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the pipe mass and installation height, the support method until the run is fixed, the exclusion below and the isolation status of connected systems.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.