Fire and protection systems
Sprinkler system installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing sprinkler pipework involves heavy pipe overhead, threading and grooving machinery, and a system that is later filled and pressurised.
High-energy check
Pipe lengths and fittings dropped from height can exceed the 1500 J trigger. Charged sprinkler mains add stored pressure this tool does not calculate.
Trigger checks
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the pipe mass and fixing height, the support until the run is complete, the exclusion below and whether any connected main is charged.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.