Fire and protection systems
VESDA and fire alarm installation
This card shows the energy in this activity and what to verify before starting. It's a reference, not a step-by-step procedure. The checklist below stays on this screen; nothing is saved or sent.
Installing detection pipework, detectors and panels involves overhead drilling and work that continues into rooms with live systems as commissioning progresses.
High-energy check
Tools and fittings dropped from height can exceed injury thresholds. Panels become energised during commissioning while installation work continues nearby.
Trigger checks
Direct controls to verify
Ticks stay on this screen only. Nothing is saved or sent.
For your SPA or pre-start
State the work height and access, how tools are secured, which panels are energised and how detection isolations are authorised and recorded.
Limitations: This tool supports planning and verification only. It does not replace competent risk assessment, legal duties, employer procedures, client requirements or competent supervision.