Tasks
Each card is a reference, not a to-do list: it shows the energy present in that activity, then links to a calculator or trigger check. Open a card to see the direct controls to verify before work starts.
10 of 10 tasks shown
No tasks match. Clear the filter to see all tasks.
Lifting and logistics · 0 tasks
Work at height · 1 task
Roof work
Gravity calculatorRoof work exposes people to falls from the edge or through fragile surfaces, and exposes those below to dropped materials.
Electrical and power · 4 tasks
Panel energisation
Trigger checksEnergising a panel introduces electrical energy that this tool does not calculate.
Live testing
Trigger checksLive testing deliberately applies electrical energy while people are working close to the equipment under test.
Switchgear commissioning
Trigger checksCommissioning switchgear moves equipment from a dead construction state to an energised operational state in stages.
Battery connection
Trigger checksConnecting batteries works directly on terminals that cannot be de-energised, with arc and chemical exposure.
Mechanical and pressure · 3 tasks
Refrigerant charging
Trigger checksCharging refrigerant handles pressurised chemical under pressure with asphyxiation and cold-burn exposure.
Insulation installation
Trigger checksInsulating pipework and ductwork uses adhesives, sealants and fibrous materials, often overhead and in enclosed spaces.
Heat trace installation
Trigger checksInstalling heat trace fits electrical heating elements along pipework that later becomes both energised and hot.
Fire and protection systems · 0 tasks
Civil, structures and fit-out · 0 tasks
Commissioning and testing · 2 tasks
Load bank testing
Trigger checksLoad bank testing applies full electrical load, producing high current and intense heat at the load bank.
Integrated systems testing
Trigger checksIntegrated testing runs multiple building systems together, so equipment can start, move or change state without local warning.